Copyright © 2008 DuraShutter® All Rights Reserved |
|
|
1 |
Cut Louvers (ready to ship) |
|
|
2 |
Cut Stiles (ready to ship) |
|
|
3 |
Cut Rails |
|
|
4 |
Move to next station |
|
|
5 |
Mill Rail |
|
|
6 |
Insert Hinges |
|
|
7 |
Q C |
|
|
8 |
Pack-N-Ship |
|
1 |
Cut Louvers |
|
2 |
Move to next station |
|
3 |
Drill & staple |
|
4 |
Buy Pin, then insert |
|
5 |
Repeat 2&3 to other side |
|
6 |
Move to tree station |
|
7 |
Cut tilt bar |
|
8 |
Route 2 ends of tilt bar |
|
9 |
Move to next station |
|
10 |
Assemble louvers to tilt bar |
|
11 |
Move to assemble dept |
|
12 |
Cut Rails |
|
13 |
Move to next station |
|
14 |
Drill dowel holes |
|
15 |
Move to next station |
|
16 |
Buy, glue & insert dowels |
|
17 |
Repeat 13,14 & 15 |
|
18 |
Move to next station |
|
19 |
Drill tilt bar route holes |
|
20 |
Move to next station |
|
21 |
Cut Stiles |
|
22 |
Move to next station |
|
23 |
Drill dowel holes for rail |
|
24 |
Repeat to other side |
|
25 |
Move to next station |
|
26 |
Drill louver tension pin hole |
|
27 |
Move to next station |
|
28 |
Drill holes for louver pins |
|
29 |
Move to next station |
|
30 |
Glue up of stiles and rails |
|
31 |
Insert tension pin |
|
32 |
Insert louvers/tree to panel |
|
33 |
Move to paint dept |
|
34 |
Cut Frames |
|
35 |
Apply primer paint coat |
|
36 |
Move then sanding |
|
37 |
Move then apply finish |
|
38 |
Move then frame-up. |
|
39 |
Move then hinge frames |
|
Chop saw station |
|
$200.00 |
|
Louver drill/stapler station |
|
$5,000.00 |
|
|
|
|
|
|
|
Tilt bar mill router station |
|
$1,500.00 |
|
Tilt bar tree assembly station |
|
$10,000.00 |
|
|
|
|
|
Rail dowel driller station |
|
$5,500.00 |
|
|
|
|
|
|
|
Tilt bar drilling station |
|
$1000.00 |
|
|
|
|
|
Stile dowel hole driller station |
|
$2,500.00 |
|
|
|
Tension pin driller station |
|
$2,500.00 |
|
Louver pin stile driller station |
|
$25,000.00 |
|
7-clamping assemble tables |
|
$25,000.00 |
|
|
|
Paint booth |
|
$25,000.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DuraShutter® |
Sq. Ft. |
Traditional design |
Sq. FT. |
|
Fabrication step required complete shutter and Cost per sq. ft. |
.75 |
39 |
$2.00 |
|
|
Building Size/ floor space |
500 S/F |
.05 |
10,000 S/F |
.25 |
|
Machinery Cost |
.05 |
$30,000 |
.25 |
|
|
Required components (inventory cost carry ROI) |
.03 |
14 |
.10 |
|
|
Restock able components (scrap) |
90% |
.02 |
5% |
.15 |
|
Learning curve (recruiting , tanning, on-going management ) |
2 |
.03 |
10 |
.10 |
|
After sale service factor |
2 |
.02 |
10 |
.10 |
|
Barrier of entry factor |
2 |
- |
10 |
- |
|
Additional barrier of entre cost including personnel |
$10,000 |
.03 |
$30,000 |
.30 |
|
Material cost. (32” x 48’ 1 panel) |
- |
$5.00 |
- |
$8,00 |
|
Finishing cost |
none |
Incl. |
$10,000 |
$3.00 |
|
Delivery time-ROI per year |
1-3 day |
<.25> |
3-8 wks |
.15 |
|
Total estimate. Your cost will vary, please conduct your own study |
$12,000 |
$6.98 |
$70,000 |
$14.35 |
|
Delivery time-ROI per year |
104 per |
year |
12 per |
year |